Kesseparation
KES-Centrifuge-Product-Application
WBM Treatment System
2022-10-30

During drilling operation, the OBM drilling cuttings need to be collected and treated at the same time. Because of the contamination to the soil, OBM cuttings cannot drop to ground. The OBM cuttings can be collected by screw conveyors, and further dried by vertical cutting dryer; more drilling fluids can be recovered and pump back to active tank system. We normally call it on-line treatment system to OBM cuttings.

For spent water-based mud, it normally will be dropped into the mud pit for storage. The Chinese government began to require contractors to deal with spent WBM several years ago. With the emergence of more environmental problems, more countries in the World put regulations in the treatment of spent WBM.

Based on our former experience in China domestic market, KES Separation Design filter press system with dosing unit to achieve a bigger treating capacity; the working performance has been verified and the user can get dry solids mud cake and clean water. 

SNProductApplication
1Submersible slurry pump
used to transfer the spent WBM from mud pit to our system
2Dosing and mixing tank system
used for flocculation and mixing with spent WBM
3Dosing unit skid2 or 3 sets dosing unit for PAC or PAM flocculation
4Cleaning water collection tank

used to collect the water discharged from filter press;

also working to supply water to the dosing tank system

5Plate and frame filter press

to finally treat the spent WBM after coagulation and flocculation

The user can get dry mud cake and clean water 

6RemarksWe can suggest on the specific workflow and dosing ratio per request.

Below pictures of waste WBM treating system before delivery from factory:


Below pictures, the Filter Press system working at jobsite.